How to create a Checklist Template

Christina Hill avatar
Written by Christina Hill
Updated over 2 weeks ago

Got a checklist template built and ready to go? Email it as an attachment to support@conqahq.com and we'll get it loaded for you! If you need guidance around what can be included, keep reading.

To add checklist instances into your project structure, they will need to be available as templates in your project library.

The most simple checklists are made up of only a checklist name and checkpoints. To create a simple checklist use the below structure in Excel or Google Sheets, just renaming the checkpoints to match your requirements. Remember for each checkpoint in your template, add the word ‘checkpoint’ into the ‘type’ column.

type

name

checklist

Fit off Checklist

checkpoint

Fixtures installed at correct height/clearance

checkpoint

Appliances installed at correct location

checkpoint

Dishwasher installed & tested

checkpoint

Final test completed & hot water tempered

checkpoint

Valves Installed/Completed (As Per Below) - Any issues comment below

How to build more complex Checklist Templates

To create more complex checklists, you can include different components in the type column of your template. These can include sections to break up your checklist, as well as checkpoints with different datapoints attached, like tickboxes, buttons, dropdowns and text input.

See here for a full list of the different components used in checklist templates: Template components

Here is an example of what you might see in a complex checklist template

type

name

checklist

Plumbing Rough-In Water/Gas/Sewer Checklist

section

Sewer Stacks/Water Supply

checkpoint

Pipe Work Secured in ceiling

checkpoint

Pipe Work Secured in wall

checkpoint

Pipe Work Siliconed

checkpoint

Check for Crossovers

checkpoint

Pressure Test 1500 KPA or product/job spec

checkpoint

Visual check & photos attached

tickbox

Photo uploaded

checkpoint

Final test completed

signoff

Request signoff from PM

section

Water & Gas Rough-In/Pre-line Inspection

checkpoint

Nogs in correct Location

checkpoint

Cylinder seismic nogs in place

checkpoint

Vanity, shower, toilet nogs

checkpoint

Shower mixer - Depths allowance for tiles, nogs square to wall

checkpoint

Mixers straight

checkpoint

Capped Off

checkpoint

Rubbish removed

checkpoint

Protective covers in place

note

Attach photos of completed area

checkpoint

Final test completed

signoff

Request signoff from PM

What do you need to include in your template?

Please copy and paste the below table in Excel or Google Sheets as the basis for your checklist template

type

name

values

checklist

Checklist name

You will need to include the below components in your template:

  1. Header row

  2. Checklist name

  3. The ‘type’ of each component

  4. Values (only if required by the component type, if in doubt, leave blank)

Adding the template into CONQA

Currently, only CONQA staff can upload new checklist templates. You can email your template spreadsheet as an attachment to support@conqahq.com, or send it via Live Chat. Please advise which project/s will need the checklist template added.

Did this answer your question?